Archive for October, 2008

Drywall Day 1!

Tuesday, October 14th, 2008

They started the drywall today. They got the majority of the downstairs done and about a third of the upstairs. They were there until at least 7pm or so. They were doing some weird stuff that I have never seen with drywall. Not sure if you can see it in some of the pictures, but they were leaving doors, and windows covered. I watched the guys do my basement of our old house and they did nothing like this. Obviously they get to fix any holes, or weirdness, but I just found it strange. I’m sure it will look different tomorrow. They also covered the house in black paper and chicken wire prepping it for the stucco. Some of the Soffit and Fascia got done today as well.

More Prep Work!

Tuesday, October 14th, 2008

Yesterday they put up the rest of the scaffolding and stocked the house for drywall. Now I have seen some drywall before, but there is a crap load of it in the house right now. And some HUGE pieces. I didn’t know they made it that big. Hopefully they will get started on that today. They still haven’t put up the Soffit and Fascia but I’m sure they won’t forget it. Not really something I worry too much about. This week they are suppose to install all of the drywall, mud, and tape. And also start stuccoing the house. The dates on the stucco are 10/14-10/29. So looks to go on for several weeks. They are also suppose to blow the attic insulation this week as well.

Insulation & Recabling!

Tuesday, October 14th, 2008

These pictures are from Friday. They installed all of the insulation and a guy came to move all of my network and tv cable to the correct location. He did a really nice job of tucking the cable and made it look nice. Looks like they only insulate the outter walls of the house. Would of been nice to get all of the walls insulated, but maybe that is over kill. Would possibly cut down on noise though.

Ext. Doors, & Central Vac!

Tuesday, October 7th, 2008

Today we had our Framing walkthrough and told them about all the things we wanted fixed. I pled with them about moving the media panel, so we will see what they do. Might have to get ugly about it! Anyway while we were doing our walkthrough the central vac guy was there installing the lines for the central vac. Then after we left they came and installed the exterior doors. Amazing how doors can make it feel so enclosed now. Makes it feel like a house. First picture is our front door and the second picture is our back door. No more sliding glass door with a doggie door in it for us! WOOO!

Electrical, Network, Cable!

Monday, October 6th, 2008

Today they did the majority of the Electrical, Network, and Cable wiring. They are missing a couple of things that we will tell them about tomorrow during our Framing walk through tomorrow. One of the biggest problems is that they ran all of the TV cable and Network cable to the wrong location. It is all suppose to be run to the Mechanical Room upstairs. This poses a problem because I specifically ran an outlet in the Mechanical Room for my routers, switches, and Server. One of the 2×4’s in the Mechanical Room specifically says “Panel” with an arrow pointing to where it is suppose to go. Boo on them for not reading the plans again. Wish me luck on getting it corrected. So far they have been very good to fix mistakes. Let’s hope they see it my way.

Chris Conference Pics!

Thursday, October 2nd, 2008

Click Here to take a gander at some of the pics from my QA conference this week! Peace!

Windows, Shingles Done!

Thursday, October 2nd, 2008

They came and installed all the windows today. They also put all the shingles on the roof. They were still there finishing up the 3rd car garage while Beka went to take pictures. Not entirely sure what they are doing tomorrow. They did some more plumbing as well. Looks like they ran some of the mains and hooked into the main in the crawl space. They look like they are primed to pour some more cement but who knows. We will just watch and see.

Plumbing Time!

Wednesday, October 1st, 2008

The framing is all done. Right on time! They were super busy today. The neighbor came over and told Beka that they could barely drive down the street today cuz so much was going on. They finished the roof this morning and then put down the black paper stuff to prep for the shingles. The plumber came today and put in all the plumbing. They also tore out the cracked piece of concrete in our driveway. It’s on the schedule to pour the patio tomorrow, so I would assume they are going to pour the patio, driveway, and the extra piece in the back that they messed up. If you look in the garage you can see the windows stacked in there as well. They are putting those in tomorrow too. We scheduled our Framing meeting for Tuesday to review the framing to see what needs to be fixed before they continue. As far as I can tell there are only a couple 2×4’s that need to be replaced. They also framed in the attic access and cut the hole in the downstairs closet to access the crawl space.

Roof Day 1 & 2

Wednesday, October 1st, 2008

They are just about done with the roof. You can see one little section not done yet. I’m sure they will finish that up tomorrow. The windows are scheduled to be delivered tomorrow as well as a few other things. They should be starting shingles very soon as well. After that the weather can do whatever it wants. I am praying for a warmish summer until we get in, so sorry to the winter lovers.