Doors, Trim, & Railing!
Today they installed a lot of stuff. They installed ALL of the interior doors, and put the trim on all of them. They put about 90% of the base boards on as well. The thing I am most excited about is the railing. It looks better than I ever imagined. The picture doesn’t show it very well but the color is hammered bronze, with the alder hand rail. The top picture is the hand and open rail. The next picutre is the french doors to my office. The next picture is some of the interior doors. The last picture shows the base boards.