Plumbing Time!
The framing is all done. Right on time! They were super busy today. The neighbor came over and told Beka that they could barely drive down the street today cuz so much was going on. They finished the roof this morning and then put down the black paper stuff to prep for the shingles. The plumber came today and put in all the plumbing. They also tore out the cracked piece of concrete in our driveway. It’s on the schedule to pour the patio tomorrow, so I would assume they are going to pour the patio, driveway, and the extra piece in the back that they messed up. If you look in the garage you can see the windows stacked in there as well. They are putting those in tomorrow too. We scheduled our Framing meeting for Tuesday to review the framing to see what needs to be fixed before they continue. As far as I can tell there are only a couple 2×4’s that need to be replaced. They also framed in the attic access and cut the hole in the downstairs closet to access the crawl space.